Local Club: Washington Trails Association (WTA)
Apr 22, 2024: Pacific Rim Institute
Apr 21, 2024: olt-workshops
Apr 18, 2024: New trail opens in Sammamish, connecting local parks system
Land Manager: USFS - Mt. Baker-Snoqualmie National Forest Office
16.1 mi 25.8 km • 5,068' Up 1544.59 m Up • 5,067' Down 1544.42 m Down
9.7 mi 15.5 km • 3,848' Up 1173.02 m Up • 3,848' Down 1172.73 m Down
2.3 mi 3.6 km • 370' Up 112.76 m Up • 370' Down 112.71 m Down
4.3 mi 6.9 km • 1,111' Up 338.7 m Up • 1,110' Down 338.42 m Down
19.5 mi 31.3 km • 2,603' Up 793.54 m Up • 2,604' Down 793.57 m Down
3.2 mi 5.1 km • 1,088' Up 331.62 m Up • 1,088' Down 331.53 m Down
0 Comments