Local Club: Washington Trails Association (WTA)
Apr 22, 2024: Pacific Rim Institute
Apr 21, 2024: olt-workshops
Apr 18, 2024: New trail opens in Sammamish, connecting local parks system
Land Manager: USFS - Mt. Baker-Snoqualmie National Forest Office
8.2 mi 13.1 km • 3,055' Up 931.15 m Up • 3,054' Down 931.01 m Down
9.7 mi 15.5 km • 3,848' Up 1173.02 m Up • 3,848' Down 1172.73 m Down
4.3 mi 6.9 km • 1,111' Up 338.7 m Up • 1,110' Down 338.42 m Down
4.3 mi 6.9 km • 2,034' Up 619.98 m Up • 2,034' Down 619.9 m Down
7.7 mi 12.4 km • 2,110' Up 643.16 m Up • 2,109' Down 642.96 m Down
0.8 mi 1.3 km • 81' Up 24.82 m Up • 76' Down 23.29 m Down
0 Comments