Local Club: Washington Trails Association (WTA)
Apr 22, 2024: Pacific Rim Institute
Apr 21, 2024: olt-workshops
Apr 18, 2024: New trail opens in Sammamish, connecting local parks system
Land Manager: USFS - Mt. Baker-Snoqualmie National Forest Office
16.1 mi 25.8 km • 5,068' Up 1544.59 m Up • 5,067' Down 1544.42 m Down
9.7 mi 15.5 km • 3,848' Up 1173.02 m Up • 3,848' Down 1172.73 m Down
4.3 mi 6.9 km • 1,111' Up 338.7 m Up • 1,110' Down 338.42 m Down
6.6 mi 10.7 km • 3,281' Up 1000.02 m Up • 3,282' Down 1000.36 m Down
13.0 mi 21.0 km • 1,782' Up 543.16 m Up • 1,782' Down 543.09 m Down
4.8 mi 7.7 km • 424' Up 129.28 m Up • 424' Down 129.23 m Down
0 Comments