Hiking Project Logo

A gentle descent or climb depending on which direction you hike.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.4

Miles

0.6

KM

Point to Point

635' 194 m

High

548' 167 m

Low

0' 0 m

Up

87' 26 m

Down

5%

Avg Grade (3°)

10%

Max Grade (6°)

Dogs Unknown

Description

The Pipeline Trail commences at the Bruce Side Trail - Iroquoia Section and ends at the intersection of the Z Trail and N Trail, or where the power lines run. It is a fairly open, wide singletrack trail which can be taken in either direction without too much difficulty.

Shared By:

Trevor Miller

Trail Ratings

  3.0 from 1 vote

#26

in Waterdown

#34730

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#26

in Waterdown

#232

in Ontario

#34,730

Overall
3 Views Last Month
87 Since Jul 19, 2017
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.