Hiking Project Logo

A gentle stroll from Petone to the Korokoro Dam.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

2.6

Miles

4.1

KM

Point to Point

243' 74 m

High

24' 7 m

Low

313' 95 m

Up

113' 35 m

Down

3%

Avg Grade (2°)

16%

Max Grade (9°)

Dogs Unknown

Features Birding · River/Creek · Spring · Waterfall · Wildflowers

Description

A pleasant and gentle singletrack that follows the Korokoro stream from the end of Cornish Street in Petone up to the disused Korokoro Dam. The track more-or-less follows, and is often directly built upon, the pipe that used to deliver water from the dam to Petone and beyond. There is a smaller dam along the way to the upper dam.

Some sections of track are narrow with a near-vertical drop to the stream, so some caution is advised.

This track is also used as an exit from the Belmont Regional Park and Puke Ariki, usually via Belmont Trig South and Baked Beans Bend.

Contacts

Shared By:

Jonathan Moulds

Trail Ratings

  5.0 from 1 vote

#2063

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#23

in New Zealand

#2,063

Overall
19 Views Last Month
1,950 Since Feb 8, 2017
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.