Concrete Bridge Road

 1 vote
Building Map
Loading Map Data
Map Settings
Featured Hike
Trail

1.9 Miles 3.0 Kilometers


Doubletrack

173' 53 m

Ascent

-129' -39 m

Descent

513' 157 m

High

346' 105 m

Low

3%

Avg Grade (2°)

8%

Max Grade (5°)

Unknown

Update

A wooded, gravel trail.

russell hobart

Overview

Closed September 26 through December 16, Monday - Friday for deer herd reduction .
Features: Birding — Fall Colors — River/Creek — Wildflowers — Wildlife
Dogs: Leashed

Description

From the road, jump onto the gravel trail. You start out in a Loblolly pine forest that slowly descends to the creek where the forest turns to mixed hardwoods with some Beech trees mixed in. At this point, you cross the low titular bridge, and the trail begins to trend uphill until you hit Mt Sinai Road, where this route comes to an end.

Contacts

Land Manager: Duke Forest

Rate Trail


   Clear

3.0 from 1 vote


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#5

in Durham

#5232

Overall
  3.0 from 1 vote
1 Star
0%
2 Star
0%
3 Star
100%
4 Star
0%
5 Star
0%
Rankings

#5

in Durham

#162

in North Carolina

#5,232

Overall
9 Views Last Month
16 Since Oct 16, 2016
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

Conditions



0 Comments

Hiking Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Hiking