Hiking Project Logo

A singletrack trail created to bypass the Sewer Line/ Fall Line Trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

0.1

Miles

0.2

KM

Point to Point

125' 38 m

High

103' 31 m

Low

22' 7 m

Up

2' 1 m

Down

3%

Avg Grade (2°)

5%

Max Grade (3°)

Dogs Leashed

Like with all trails, please stay off when wet, esp. during breakup.

Description

This is a nice singletrack built during an IMBA training session in 2004 to create a sustainable trail bypassing a steeper trail. This trail was built before the utility corridor (which displaced the original trail), but the turn point was rebuilt after the utility corridor was constructed.

Flora & Fauna

Poplar and other usual plants.

Contacts

Shared By:

Dot Helm

Trail Ratings

  3.0 from 1 vote

#36896

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#300

in Alaska

#36,896

Overall
2 Views Last Month
45 Since Sep 8, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started.